Active Parents App

Active Parents App

A mobile app designed to keep families active through 5 day challenges

App info


0.8
December 05, 2020
62
Android 4.4+
Everyone

Advertisement

App description


Android App Analysis and Review: Active Parents App, Developed by rodriarce. Listed in Health & fitness Category. Current Version Is 0.8, Updated On 05/12/2020 . According to users reviews on Google Play: Active Parents App. Achieved Over 62 Installs. Active Parents App Currently Has 1 Reviews, Average Rating 5.0 Stars

An app that gives challenges for families to enjoy and keep fit at the same time, developing a positive lifestyle creating better relationships.
We are currently offering version 0.8. This is our latest, most optimized version. It is suitable for many different devices. Free download directly apk from the Google Play Store or other versions we're hosting. Moreover, you can download without registration and no login required.

We have more than 2000+ available devices for Samsung, Xiaomi, Huawei, Oppo, Vivo, Motorola, LG, Google, OnePlus, Sony, Tablet ... with so many options, it’s easy for you to choose games or software that fit your device.

It can come in handy if there are any country restrictions or any restrictions from the side of your device on the Google App Store.

Rate and review on Google Play store


5.0
1 total
5 0
4 0
3 0
2 0
1 0

Total number of installs (*estimated)

Estimation of total number of installs on Google Play, Approximated from number of ratings and install bounds achieved on Google Play.