Basic Scientific Calculator

Basic Scientific Calculator

A free, straight forward and simple to use basic scientific calculator that is both robust and reliable. As well as the basic mathematics operators the scientific functions included are the trigonometric and hyperbolic functions, and their inverses,...

App info


3.4
October 29, 2017
1,000
Android 4.1+

Advertisement

App description


Android App Analysis and Review: Basic Scientific Calculator, Developed by Philip Stephens. Listed in Tools Category. Current Version Is 3.4, Updated On 29/10/2017 . According to users reviews on Google Play: Basic Scientific Calculator. Achieved Over 1,000 Installs. Basic Scientific Calculator Currently Has 5 Reviews, Average Rating 3.8 Stars

A free, straight forward and simple to use basic scientific calculator that is both robust and reliable. As well as the basic mathematics operators the scientific functions included are the trigonometric and hyperbolic functions, and their inverses, and logarithms to base 10 and the natural logarithm function. A key to calculate factorials has also been included to facilitate statistics calculations.

The scientific calculator's display can be customized with the screen and background colors being changeable. Each individual button's color can also be changed.

The calculator operates with a precision of up to 15 significant figures, although this can be reduced in the settings menu.

The calculator will store the last 10 calculations, which are re-editable. Simply use the left and right keys at the top of the keypad or scroll the top half of the screen and tap where you wish to place the cursor.

The simple and straight forward design makes this scientific calculator easy to operate but powerful enough to use for a variety of applications.
We are currently offering version 3.4. This is our latest, most optimized version. It is suitable for many different devices. Free download directly apk from the Google Play Store or other versions we're hosting. Moreover, you can download without registration and no login required.

We have more than 2000+ available devices for Samsung, Xiaomi, Huawei, Oppo, Vivo, Motorola, LG, Google, OnePlus, Sony, Tablet ... with so many options, it’s easy for you to choose games or software that fit your device.

It can come in handy if there are any country restrictions or any restrictions from the side of your device on the Google App Store.

Rate and review on Google Play store


3.8
5 total
5 40.0
4 40.0
3 0
2 0
1 20.0